Interface Coordination

Once the project obtains the construction permit, the project manager will hold regular coordination and integration meetings with subcontractors to confirm coordination and control mechanisms. Based on the coordination and interface integration processes with subcontractors, solutions for construction interfaces and supporting plans will be developed prior to construction to reduce the risk of conflicts and delays in the project timeline.

Interface Coordination during the Construction Phase

工程管理

Integration of Plumbing and Electrical Interfaces

MEP equipment locations and pipe routes are mapped for coordination, ensuring smooth installation without elevation conflicts.

工程管理

Integration of Structural and MEP Interfaces

Civil works are coordinated with MEP systems by integrating required elements into structural/architectural drawings for subcontractors' reference.

工程管理

Subcontract Work Interface Coordination

Kunlun Engineering creates the Subcontract Work Interface Coordination Plan based on a timeline, scheduling subcontractors' tasks in order to ensure smooth execution.

Design-Build Execution Strategy

"Persist in doing the best if you're going to do something. With the relentless ambition of being the number one brand, never settling for second place."

Since its establishment, Kunlun Engineering & Industrial Co., Ltd. has adhered to its consistent mission and principles, continuously improving and striving in the design-build field. The company's experience in executing design-build projects includes large-scale green buildings, such as the Taiwan Suidoi Yongo Factory New Construction Project, and high-risk chemical plants, such as the Zhongmeihe Taichung Plant No. 6 Equipment Foundation New Construction Project.

Organizational Structure

工程管理

01

Considerations of User Requirements

According to the project specifications, the construction will be planned in alignment with the current site conditions, project timeline, and issues for discussion, aiming to meet both the requirements and expectations of the project.

工程管理

02

Planning, Design, and Construction

The planning and design phase incorporates a review based on actual construction experience, addressing potential construction challenges and interface issues to eliminate any uncertainties.

工程管理

03

Cost-Effectiveness Management

Cost calculations are integrated before construction, with the formulation of subsequent projected construction and requisition amounts, in order to effectively manage the project budget.

工程管理

04

Quality Execution Management

Quality control operations are carried out according to the company’s three-level inspection system. Any deficiencies are immediately addressed to achieve proactive prevention and ensure quality standards are met in advance.

工程管理

05

Interface Integration and Clarification

By considering comprehensive requirements, reducing planning time, and implementing quality management to minimize errors, the goal is to save time across all project stages.

工程管理

06

Schedule Control and Review

Utilizing the characteristics of the design-build approach, processes and interfaces are integrated before the construction of each work item, and smooth, equitable communication channels are established.