Construction Phase Interface Coordination
Water and electricity interface integration
Prepare drawings of key MEP equipment locations and pipeline routes for coordination, ensuring constructibility without elevation conflicts. These will be provided to subcontractors for developing their shop drawings.
Structural and MEP Interface Integration
Coordinate civil engineering with MEP systems, ensuring structural safety. Include necessary openings and components in the drawings for subcontractors' reference.
Subsection Construction Interface Coordination
Key lead Construction will develop a time-based interface coordination plan, scheduling subcontractors' work. Subcontractors must submit their plans for integration into this coordination plan.