Construction Phase Interface Coordination

Water and electricity interface integration

Prepare drawings of key MEP equipment locations and pipeline routes for coordination, ensuring constructibility without elevation conflicts. These will be provided to subcontractors for developing their shop drawings.

Structural and MEP Interface Integration

Coordinate civil engineering with MEP systems, ensuring structural safety. Include necessary openings and components in the drawings for subcontractors' reference.

Subsection Construction Interface Coordination

Key lead Construction will develop a time-based interface coordination plan, scheduling subcontractors' work. Subcontractors must submit their plans for integration into this coordination plan.