坤倫工程-工程管理

Interface Coordination

Once the project obtains the construction permit, the project manager will hold regular coordination and integration meetings with subcontractors to confirm coordination and control mechanisms. Based on the coordination and interface integration processes with subcontractors, solutions for construction interfaces and supporting plans will be developed prior to construction to reduce the risk of conflicts and delays in the project timeline.

Interface Coordination during the Construction Phase

坤倫工程-水電界面整合

Integration of Plumbing and Electrical Interfaces

MEP equipment locations and pipe routes are mapped for coordination, ensuring smooth installation without elevation conflicts.

坤倫工程-結構與機電界面整合

Integration of Structural and MEP Interfaces

Civil works are coordinated with MEP systems by integrating required elements into structural/architectural drawings for subcontractors' reference.

坤倫工程-分項施工界面協調整合

Subcontract Work Interface Coordination

Kunlun Engineering creates the Subcontract Work Interface Coordination Plan based on a timeline, scheduling subcontractors' tasks in order to ensure smooth execution.

Design-Build Execution Strategy

"Persist in doing the best if you're going to do something. With the relentless ambition of being the number one brand, never settling for second place."

Since its establishment, Kunlun Engineering & Industrial Co., Ltd. has adhered to its consistent mission and principles, continuously improving and striving in the design-build field. The company's experience in executing design-build projects includes large-scale green buildings, such as the Taiwan Suidoi Yongo Factory New Construction Project, and high-risk chemical plants, such as the Zhongmeihe Taichung Plant No. 6 Equipment Foundation New Construction Project.

Organizational Structure

坤倫工程-使用需求考量

01

Considerations of User Requirements

According to the project specifications, the construction will be planned in alignment with the current site conditions, project timeline, and issues for discussion, aiming to meet both the requirements and expectations of the project.

坤倫工程-規劃設計施工

02

Planning, Design, and Construction

The planning and design phase incorporates a review based on actual construction experience, addressing potential construction challenges and interface issues to eliminate any uncertainties.

坤倫工程-經費效益控管

03

Cost-Effectiveness Management

Cost calculations are integrated before construction, with the formulation of subsequent projected construction and requisition amounts, in order to effectively manage the project budget.

坤倫工程-品質執行管理

04

Quality Execution Management

Quality control operations are carried out according to the company’s three-level inspection system. Any deficiencies are immediately addressed to achieve proactive prevention and ensure quality standards are met in advance.

坤倫工程-界面整合釐清

05

Interface Integration and Clarification

By considering comprehensive requirements, reducing planning time, and implementing quality management to minimize errors, the goal is to save time across all project stages.

坤倫工程-工期掌握檢討

06

Schedule Control and Review

Utilizing the characteristics of the design-build approach, processes and interfaces are integrated before the construction of each work item, and smooth, equitable communication channels are established.